Planning a Tennis Court Lighting Project: A Checklist
A court lighting project touches players, neighbors, budgets and often a board vote. This checklist walks club managers and HOA boards through what to settle, in order, so the project is designed right the first time and the proposals you receive can be compared fairly. Print it and bring it to your next meeting.
1. Agree on the goals
- What level of play will the courts host: casual, club and league, or tournament?
- What target light level does that mean? Most club, HOA and resort courts aim for about 50 average foot-candles, with the brightest point no more than twice the dimmest.
- Will any courts be lined for pickleball now or later?
- What are the problems today: dark spots, glare, failing fixtures, high bills, neighbor complaints?
2. Gather the site facts
- Number of courts and their layout.
- Existing poles: height, location, condition and foundations.
- Existing fixtures: type, wattage and count.
- Electrical service, panels and wiring condition.
- Distance to the nearest homes, and which way they face.
- A site plan or aerial image. A site visit is often not needed at this stage.
3. Check the rules
- Local lighting or zoning limits on spill light at the property line.
- Any curfew on court lighting hours.
- HOA or club approvals needed, and the board calendar.
- Permit requirements for new poles or electrical work.
4. Get a design before you get prices
- A lighting design showing average foot-candles across the full playing area, including the space beyond the lines.
- The uniformity ratio.
- Spill light at the property line.
- Fixture locations and aiming, with no fixture in a server’s line of sight.
- More than one product option, compared side by side.
5. Plan for neighbors
- Sharp cutoff fixtures, mounted flat, with no light above horizontal.
- Back shields where homes are close.
- A curfew timer.
- A short note to nearby residents before work starts.
6. Set the budget
- Fixtures, poles and foundations priced separately.
- Electrical upgrades priced separately.
- Controls priced separately.
- A realistic total budget built from a design, not a guess. In our experience, setting the right budget is the step boards most often get wrong, and an underfunded project stalls or gets cut back.
- Energy and maintenance savings estimated from your actual hours of play and electric rate.
7. Choose controls
- Timer or curfew.
- Keypad, app or booking system integration.
- Separate control for each court.
- Dimming for practice or maintenance.
8. Plan the work
- Schedule around league play and the busy season.
- Protect the court surface from lifts and equipment.
- Final light level readings after installation, compared with the design.
- Warranty terms and who to call if something fails.
What this means for your property
- Decide the goals first. Level of play sets the light level, and the light level sets the design.
- Budget from a design, not a guess. It is the step boards most often get wrong.
- Get a design before prices, so every proposal is built to the same standard.
- Make neighbors part of the plan, not an afterthought.
- Verify the result. A final reading proves you got what you paid for.
Let our team work through the checklist with you
Start with a free 20-minute project review, with no cost and no obligation. Send us your site plan or address, and our team will design your court lighting in AGi32 Lighting Software, compare product options side by side, and help you bring a clear plan to your board. One point of contact from first call to final walkthrough, and we reply within one business day.
Schedule a Free 20-Minute Project Review
More about our tennis court lighting specialty.
Sources
- Tennis Courts: A Construction and Maintenance Manual, United States Tennis Association and American Sports Builders Association.